31242827EN-03 28 LU-VE Exchangers is a trademark registered and owned by LU-VE Group. LU-VE Exchangers reserves the right to change specifications without prior notification. 6 Maintenance Ensure complete electrical isolation before performing any maintenance activity and always follow guidelines and instructions as given in the air coolers product manual. 6.1 Side panel opening Hinged side covers can be opened for inspection, cleaning and maintenance purposes. This can only be done by qualified personnel. To open side covers, loosen the wing screw. 6.2 Drain tray opening Always disconnect drain line before opening the drain tray. Remove the screws on the fan side and open the drain tray. When mounting feet are present, lower the drain tray carefully. Respect the maximum opening angle to avoid damage to the drain tray.